Compressed Bio-Gas (CBG) plant setup under SATAT scheme — bankable DPR, PESO approval, SATAT LoI with IOCL/BPCL/HPCL, GOBARdhan subsidy up to ₹4 Cr. Ziloxis delivers 15 TPD to 200 TPD turnkey plants in 10-14 months.
60-page DPR mapped to SBI / IREDA term-loan template — tech, feedstock, financial model.
20-year offtake Letter of Intent from IOCL, BPCL or HPCL at CBG rate ₹54/kg + GST escalation.
Up to ₹4 Cr CFA under GOBARdhan (₹0.75 Cr per 100 kg CBG/day), filed by Ziloxis.
Pre-digester → digester → upgrading → bottling → dispatch — 10 to 14 months handover.
All pricing exclusive of GST · Taxes extra · Terms as per signed mandate
Pick your plant type and move the sliders. We'll return bankable CAPEX, central subsidy bracket and payback period — plus a free DPR guide.
CBG rates basis SATAT offtake price of ₹54/kg plus bio-manure revenue at ₹3-6/kg. GOBARdhan CFA is capped at ₹4 Cr per plant. All CAPEX figures exclusive of GST.
Name + WhatsApp only · instant PDF · call-back in 20 min
Share your requirement — we'll revert within 24 hours with a tailored proposal and indicative numbers.