Solar Plant Installation & EPC in Bengaluru

Turnkey rooftop, commercial and MW-scale solar plants in Bengaluru — PM-Surya-Ghar subsidy filed on your behalf, DISCOM net-metering handled end-to-end, Tier-1 modules with 25-year linear performance warranty.

Executive Overview

Solar in Bengaluru · Quick Facts

Solar in Bengaluru — Executive Overview, Turnkey Deliverables, Geographies Served and Execution Timeline.
AttributeDetails
Solar Irradiance (GHI)1,928 kWh/m² / year
Peak-Sun Hours2,600 hrs / year (avg 7.12 hrs/day)
Local DISCOMBESCOM · MESCOM (peri-urban) · HESCOM (industrial belt)
Net-Metering PolicyKERC allows net-metering up to 500 kW LT + 2 MW HT. Group net-metering permitted for gated communities and campuses.
PM-Surya-Ghar + StatePM-Surya-Ghar ₹30,000/kW (max ₹78,000). No standalone state subsidy; KREDL waives processing fee.
Typical Plant SizesIT-park rooftop 100 kW – 1 MW · Villa rooftop 5–15 kW · Manufacturing 500 kW – 3 MW
Grid Tariff Slab₹4.15 – ₹9.75 per kWh (BESCOM LT-domestic, FY25-26)
Simple Payback4.0 – 4.8 years post-subsidy
Expert Perspective

Core Differentiators

  • Site-visit + shadow analysis done in Bengaluru within 72 hours of enquiry — no advance retainer.
  • DISCOM liaison handled end-to-end: net-metering application, feasibility, meter-installation, inspection sign-off.
  • PM-Surya-Ghar portal filing on behalf of the customer — subsidy released to your account 15-30 days post commissioning.
  • Only Tier-1 module + inverter brands (Waaree · Tata · Adani · Fronius · Sungrow) — 25-year linear performance warranty transferred to you.
  • SCADA + IoT monitoring for every plant ≥25 kW — remote fault detection, monthly O&M report emailed on the 1st.
  • EPC + O&M + financing under one roof — Ziloxis Loan Desk arranges term-loan / OPEX-PPA if you don't want CAPEX.
High-Intent Q&A

Frequently asked about Solar in Bengaluru

What plant size makes sense for a household in Bengaluru?+
For a 3 BHK with ~₹4,000-6,000 monthly bill, a 3-5 kW rooftop covers 80-100% of consumption. Post PM-Surya-Ghar subsidy (₹30,000/kW up to ₹78,000) the effective spend is ₹1.6-2.2 lakhs for 3 kW and ₹2.4-3.0 lakhs for 5 kW. Payback: 4.0 – 4.8 years post-subsidy.
Which DISCOM handles my net-metering application in Bengaluru?+
BESCOM · MESCOM (peri-urban) · HESCOM (industrial belt). Ziloxis files the application on your behalf, coordinates the site-feasibility inspection and installs the DISCOM-approved bi-directional meter.
Can I claim the PM-Surya-Ghar subsidy in Bengaluru?+
Yes. PM-Surya-Ghar ₹30,000/kW (max ₹78,000). No standalone state subsidy; KREDL waives processing fee. We manage the portal registration, vendor mapping (Ziloxis is empanelled), inspection and subsidy release. You receive the DBT to your linked bank account within 15-30 days of commissioning.
How long does a solar plant last and what maintenance is needed?+
Modules carry a 25-year linear performance warranty (≥85% output at year 25) from all Tier-1 brands we deploy. Inverters need replacement once (year 10-12). Ziloxis O&M contract includes monthly cleaning + quarterly performance audit + SCADA monitoring.
Do you install solar on rented / leased property in Bengaluru?+
Yes — via an OPEX-PPA model. Ziloxis (or our funding partner) owns the plant, you pay only for the units generated at 30-40% below your DISCOM tariff. No CAPEX, no maintenance. Contract runs 10-15 years, transferable at exit.
What is the typical grid-tariff you'd offset in Bengaluru?+
₹4.15 – ₹9.75 per kWh (BESCOM LT-domestic, FY25-26). That's the number that drives your payback — higher your slab, faster the plant pays for itself.
Sectors Ziloxis solarises in Bengaluru

Live pipeline — Bengaluru

  • IT-park rooftop
  • Tech-campus
  • Data-centre PPA
  • Villa-community group-net-metering
Get our full price grid
All prices exclusive of GST · Taxes extra
MNRE-empanelled EPC
Tier-1 modules · 25-yr linear warranty
PM-Surya-Ghar filed
Subsidy DBT in 15-30 days post-COD
72-hour site-visit SLA
Callback in 20 min · Bengaluru team
Ziloxis · From the field in Bengaluru

Case studies from live Bengaluru solar projects

OPEX-PPA (leased premises)
IT-park tenant · Whitefield
Plant
280 kW
CAPEX
Zero (Ziloxis-owned, PPA at ₹5.20/kWh — 34% below BESCOM slab)
Savings
₹42 L / year · 15-year contract, transferable
Payback
N/A (OPEX model) · IRR 21% for Ziloxis funding partner
“Because it's a leased space, CAPEX was off the table. The PPA route means our finance team just sees a lower monthly bill — no capex approval loop.”
Villa-community group net-metering
Villa community · Sarjapur (32 units)
Plant
160 kW (5 kW per villa × 32)
CAPEX
₹86 L across 32 owners · PM-Surya-Ghar refund landed in 24 days
Savings
Average villa saves ₹65 K per year
Payback
4.2 years per unit
“Group net-metering was new for BESCOM — Ziloxis had done it once before and had the paperwork template ready. The RWA board rated the process 9/10.”

Case studies are anonymised composites drawn from Ziloxis' actual EPC pipeline in Bengaluru. Plant sizes, CAPEX and savings figures reflect real deployed projects.

What solar clients say

Rated by Ziloxis solar clients

5.0· 3 client reviews
Our warehouse now runs on 100% solar. AC bills dropped ₹4.2 L/month. Ziloxis's O&M contract makes it hands-off.
Nikhil Sharma
Warehouse Owner · Mumbai
500 kW rooftop at our factory — payback 3.4 years. Ziloxis handled subsidy filing under PM Suryaghar — money in the bank in 60 days.
Deepak Mittal
Operations Head · Auto-parts MSME · Faridabad
Utility-scale 12 MW project delivered on time under a PPA model. Cash flow started month 1 without any CapEx from us.
Sanjay Verma
Director · Renewable IPP · Gujarat
Share your feedback

Rate your solar experience in Bengaluru

Worked with Ziloxis? Leave a quick rating — it helps others and keeps us honest.

Free site visit · No obligation

Get a Solar Feasibility Report for Bengaluru

Share your monthly electricity bill and rooftop area — we'll send a plant-size, subsidy-adjusted price and payback timeline within 24 hours.

Helps us line up the right loan partner or expedite the direct-purchase paperwork.

Tell us more · quick details

All optional — the more you share, the sharper our first response.

Install Ziloxis
Get 1-tap access. No app store — installs in seconds.