Solar Plant Installation in Bengaluru — Rooftop · Commercial · MW-Scale | Ziloxis
solar-plant-installation-and-epc-in-bengaluru
Back to Solar Plant
1,928 GHI · Ziloxis Solar EPC

Solar Plant Installation & EPC in Bengaluru

Turnkey rooftop, commercial and MW-scale solar plants in Bengaluru — PM-Surya-Ghar subsidy filed on your behalf, DISCOM net-metering handled end-to-end, Tier-1 modules with 25-year linear performance warranty.

Executive Overview

Solar in Bengaluru · Quick Facts

Solar in Bengaluru — Executive Overview, Turnkey Deliverables, Geographies Served and Execution Timeline.
AttributeDetails
Solar Irradiance (GHI)1,928 kWh/m² / year
Peak-Sun Hours2,600 hrs / year (avg 7.12 hrs/day)
Local DISCOMBESCOM · MESCOM (peri-urban) · HESCOM (industrial belt)
Net-Metering PolicyKERC allows net-metering up to 500 kW LT + 2 MW HT. Group net-metering permitted for gated communities and campuses.
PM-Surya-Ghar + StatePM-Surya-Ghar ₹30,000/kW (max ₹78,000). No standalone state subsidy; KREDL waives processing fee.
Typical Plant SizesIT-park rooftop 100 kW – 1 MW · Villa rooftop 5–15 kW · Manufacturing 500 kW – 3 MW
Grid Tariff Slab₹4.15 – ₹9.75 per kWh (BESCOM LT-domestic, FY25-26)
Simple Payback4.0 – 4.8 years post-subsidy
Expert Perspective

Core Differentiators

  • Site-visit + shadow analysis done in Bengaluru within 72 hours of enquiry — no advance retainer.
  • DISCOM liaison handled end-to-end: net-metering application, feasibility, meter-installation, inspection sign-off.
  • PM-Surya-Ghar portal filing on behalf of the customer — subsidy released to your account 15-30 days post commissioning.
  • Only Tier-1 module + inverter brands (Waaree · Tata · Adani · Fronius · Sungrow) — 25-year linear performance warranty transferred to you.
  • SCADA + IoT monitoring for every plant ≥25 kW — remote fault detection, monthly O&M report emailed on the 1st.
  • EPC + O&M + financing under one roof — Ziloxis Loan Desk arranges term-loan / OPEX-PPA if you don't want CAPEX.
High-Intent Q&A

Frequently asked about Solar in Bengaluru

What plant size makes sense for a household in Bengaluru?+
For a 3 BHK with ~₹4,000-6,000 monthly bill, a 3-5 kW rooftop covers 80-100% of consumption. Post PM-Surya-Ghar subsidy (₹30,000/kW up to ₹78,000) the effective spend is ₹1.6-2.2 lakhs for 3 kW and ₹2.4-3.0 lakhs for 5 kW. Payback: 4.0 – 4.8 years post-subsidy.
Which DISCOM handles my net-metering application in Bengaluru?+
BESCOM · MESCOM (peri-urban) · HESCOM (industrial belt). Ziloxis files the application on your behalf, coordinates the site-feasibility inspection and installs the DISCOM-approved bi-directional meter.
Can I claim the PM-Surya-Ghar subsidy in Bengaluru?+
Yes. PM-Surya-Ghar ₹30,000/kW (max ₹78,000). No standalone state subsidy; KREDL waives processing fee. We manage the portal registration, vendor mapping (Ziloxis is empanelled), inspection and subsidy release. You receive the DBT to your linked bank account within 15-30 days of commissioning.
How long does a solar plant last and what maintenance is needed?+
Modules carry a 25-year linear performance warranty (≥85% output at year 25) from all Tier-1 brands we deploy. Inverters need replacement once (year 10-12). Ziloxis O&M contract includes monthly cleaning + quarterly performance audit + SCADA monitoring.
Do you install solar on rented / leased property in Bengaluru?+
Yes — via an OPEX-PPA model. Ziloxis (or our funding partner) owns the plant, you pay only for the units generated at 30-40% below your DISCOM tariff. No CAPEX, no maintenance. Contract runs 10-15 years, transferable at exit.
What is the typical grid-tariff you'd offset in Bengaluru?+
₹4.15 – ₹9.75 per kWh (BESCOM LT-domestic, FY25-26). That's the number that drives your payback — higher your slab, faster the plant pays for itself.
Sectors Ziloxis solarises in Bengaluru

Live pipeline — Bengaluru

  • IT-park rooftop
  • Tech-campus
  • Data-centre PPA
  • Villa-community group-net-metering
Get our full price grid
All prices exclusive of GST · Taxes extra
MNRE-empanelled EPC
Tier-1 modules · 25-yr linear warranty
PM-Surya-Ghar filed
Subsidy DBT in 15-30 days post-COD
72-hour site-visit SLA
Callback in 20 min · Bengaluru team
Ziloxis · From the field in Bengaluru

Case studies from live Bengaluru solar projects

OPEX-PPA (leased premises)
IT-park tenant · Whitefield
Plant
280 kW
CAPEX
Zero (Ziloxis-owned, PPA at ₹5.20/kWh — 34% below BESCOM slab)
Savings
₹42 L / year · 15-year contract, transferable
Payback
N/A (OPEX model) · IRR 21% for Ziloxis funding partner
“Because it's a leased space, CAPEX was off the table. The PPA route means our finance team just sees a lower monthly bill — no capex approval loop.”
Villa-community group net-metering
Villa community · Sarjapur (32 units)
Plant
160 kW (5 kW per villa × 32)
CAPEX
₹86 L across 32 owners · PM-Surya-Ghar refund landed in 24 days
Savings
Average villa saves ₹65 K per year
Payback
4.2 years per unit
“Group net-metering was new for BESCOM — Ziloxis had done it once before and had the paperwork template ready. The RWA board rated the process 9/10.”

Case studies are anonymised composites drawn from Ziloxis' actual EPC pipeline in Bengaluru. Plant sizes, CAPEX and savings figures reflect real deployed projects.

Free site visit · No obligation

Get a Solar Feasibility Report for Bengaluru

Share your monthly electricity bill and rooftop area — we'll send a plant-size, subsidy-adjusted price and payback timeline within 24 hours.

Helps us line up the right loan partner or expedite the direct-purchase paperwork.

Tell us more · quick details

All optional — the more you share, the sharper our first response.

Install Ziloxis
Get 1-tap access. No app store — installs in seconds.