Industrial HT rooftop + carport
Textile mill · Tirupattur
Plant
1.2 MW
- CAPEX
- ₹4.6 Cr
- Savings
- ₹1.6 Cr / year · TANGEDCO tariff offset
- Payback
- 3.5 years
“TANGEDCO's LT-vs-HT nuance was tricky. Ziloxis walked us through the 999 kW LT ceiling and structured the second block on HT to preserve net-metering benefits.”