Residential rooftop
3 BHK farmhouse · Chattarpur
Plant
8.4 kW
- CAPEX
- ₹4.7 L (post PM-Surya-Ghar ₹78 K subsidy)
- Savings
- ₹1.1 L annual bill offset · 92% self-consumption
- Payback
- 4.3 years
“BSES net-metering approval landed in 21 days. Ziloxis coordinated the DISCOM inspection twice when the meter installation slipped — we never had to call the sub-station.”
