Solar Plant Installation in Jaipur — Rooftop · Commercial · MW-Scale | Ziloxis
solar-plant-installation-and-epc-in-jaipur
Back to Solar Plant
2,102 GHI · Ziloxis Solar EPC

Solar Plant Installation & EPC in Jaipur

Turnkey rooftop, commercial and MW-scale solar plants in Jaipur — PM-Surya-Ghar subsidy filed on your behalf, DISCOM net-metering handled end-to-end, Tier-1 modules with 25-year linear performance warranty.

Executive Overview

Solar in Jaipur · Quick Facts

Solar in Jaipur — Executive Overview, Turnkey Deliverables, Geographies Served and Execution Timeline.
AttributeDetails
Solar Irradiance (GHI)2,102 kWh/m² / year
Peak-Sun Hours2,896 hrs / year (avg 7.94 hrs/day)
Local DISCOMJVVNL
Net-Metering PolicyRERC net-metering up to 500 kW LT + 1 MW HT. Rajasthan permits agri-solar under Kusum-C for pump feeders.
PM-Surya-Ghar + StatePM-Surya-Ghar ₹30,000/kW (max ₹78,000). Rajasthan waives GST on state-supplied panels for Kusum-C projects.
Typical Plant SizesAgri-feeder 500 kW – 2 MW · Marble / stone processing 500 kW – 3 MW · Hotel rooftops 100–500 kW
Grid Tariff Slab₹4.20 – ₹8.65 per kWh (JVVNL LT-domestic, FY25-26)
Simple Payback3.5 – 4.3 years post-subsidy
Expert Perspective

Core Differentiators

  • Site-visit + shadow analysis done in Jaipur within 72 hours of enquiry — no advance retainer.
  • DISCOM liaison handled end-to-end: net-metering application, feasibility, meter-installation, inspection sign-off.
  • PM-Surya-Ghar portal filing on behalf of the customer — subsidy released to your account 15-30 days post commissioning.
  • Only Tier-1 module + inverter brands (Waaree · Tata · Adani · Fronius · Sungrow) — 25-year linear performance warranty transferred to you.
  • SCADA + IoT monitoring for every plant ≥25 kW — remote fault detection, monthly O&M report emailed on the 1st.
  • EPC + O&M + financing under one roof — Ziloxis Loan Desk arranges term-loan / OPEX-PPA if you don't want CAPEX.
High-Intent Q&A

Frequently asked about Solar in Jaipur

What plant size makes sense for a household in Jaipur?+
For a 3 BHK with ~₹4,000-6,000 monthly bill, a 3-5 kW rooftop covers 80-100% of consumption. Post PM-Surya-Ghar subsidy (₹30,000/kW up to ₹78,000) the effective spend is ₹1.6-2.2 lakhs for 3 kW and ₹2.4-3.0 lakhs for 5 kW. Payback: 3.5 – 4.3 years post-subsidy.
Which DISCOM handles my net-metering application in Jaipur?+
JVVNL. Ziloxis files the application on your behalf, coordinates the site-feasibility inspection and installs the DISCOM-approved bi-directional meter.
Can I claim the PM-Surya-Ghar subsidy in Jaipur?+
Yes. PM-Surya-Ghar ₹30,000/kW (max ₹78,000). Rajasthan waives GST on state-supplied panels for Kusum-C projects. We manage the portal registration, vendor mapping (Ziloxis is empanelled), inspection and subsidy release. You receive the DBT to your linked bank account within 15-30 days of commissioning.
How long does a solar plant last and what maintenance is needed?+
Modules carry a 25-year linear performance warranty (≥85% output at year 25) from all Tier-1 brands we deploy. Inverters need replacement once (year 10-12). Ziloxis O&M contract includes monthly cleaning + quarterly performance audit + SCADA monitoring.
Do you install solar on rented / leased property in Jaipur?+
Yes — via an OPEX-PPA model. Ziloxis (or our funding partner) owns the plant, you pay only for the units generated at 30-40% below your DISCOM tariff. No CAPEX, no maintenance. Contract runs 10-15 years, transferable at exit.
What is the typical grid-tariff you'd offset in Jaipur?+
₹4.20 – ₹8.65 per kWh (JVVNL LT-domestic, FY25-26). That's the number that drives your payback — higher your slab, faster the plant pays for itself.
Sectors Ziloxis solarises in Jaipur

Live pipeline — Jaipur

  • Agri feeder solarisation (Kusum-C)
  • Hotel rooftops
  • Marble processing units
  • Cold-storage
Get our full price grid
All prices exclusive of GST · Taxes extra
MNRE-empanelled EPC
Tier-1 modules · 25-yr linear warranty
PM-Surya-Ghar filed
Subsidy DBT in 15-30 days post-COD
72-hour site-visit SLA
Callback in 20 min · Jaipur team
Ziloxis · From the field in Jaipur

Case studies from live Jaipur solar projects

Marble / stone HT rooftop
Marble processing unit · Kishangarh
Plant
650 kW
CAPEX
₹2.6 Cr
Savings
₹89 L / year (compressor + cutter loads dominated)
Payback
3.3 years
“The plant runs peak in daylight — solar directly offsets the highest-tariff hours. Ziloxis' load-curve analysis made a persuasive board case.”
Hospitality rooftop + carport
Heritage hotel · Amer
Plant
180 kW
CAPEX
₹78 L
Savings
₹24 L / year · hotel-tariff offset (₹9.10/kWh average)
Payback
3.6 years
“The Amer archaeological zoning was our biggest worry — Ziloxis structured a low-profile carport array that the heritage committee cleared without objection.”

Case studies are anonymised composites drawn from Ziloxis' actual EPC pipeline in Jaipur. Plant sizes, CAPEX and savings figures reflect real deployed projects.

Free site visit · No obligation

Get a Solar Feasibility Report for Jaipur

Share your monthly electricity bill and rooftop area — we'll send a plant-size, subsidy-adjusted price and payback timeline within 24 hours.

Helps us line up the right loan partner or expedite the direct-purchase paperwork.

Tell us more · quick details

All optional — the more you share, the sharper our first response.

Install Ziloxis
Get 1-tap access. No app store — installs in seconds.