Solar Plant Installation & EPC in Kolkata

Turnkey rooftop, commercial and MW-scale solar plants in Kolkata — PM-Surya-Ghar subsidy filed on your behalf, DISCOM net-metering handled end-to-end, Tier-1 modules with 25-year linear performance warranty.

Executive Overview

Solar in Kolkata · Quick Facts

Solar in Kolkata — Executive Overview, Turnkey Deliverables, Geographies Served and Execution Timeline.
AttributeDetails
Solar Irradiance (GHI)1,720 kWh/m² / year
Peak-Sun Hours2,354 hrs / year (avg 6.45 hrs/day)
Local DISCOMCESC (Kolkata core) · WBSEDCL (suburbs)
Net-Metering PolicyWBERC net-metering up to 500 kW LT + 1 MW HT. Group net-metering allowed for gated societies since 2023.
PM-Surya-Ghar + StatePM-Surya-Ghar ₹30,000/kW (max ₹78,000). WBREDA offers state processing waiver.
Typical Plant SizesJute / textile mills 500 kW – 2 MW · SME manufacturing 100–500 kW · Rooftop residential 3–10 kW
Grid Tariff Slab₹5.00 – ₹10.20 per kWh (CESC LT-domestic, FY25-26)
Simple Payback4.0 – 4.8 years post-subsidy
Expert Perspective

Core Differentiators

  • Site-visit + shadow analysis done in Kolkata within 72 hours of enquiry — no advance retainer.
  • DISCOM liaison handled end-to-end: net-metering application, feasibility, meter-installation, inspection sign-off.
  • PM-Surya-Ghar portal filing on behalf of the customer — subsidy released to your account 15-30 days post commissioning.
  • Only Tier-1 module + inverter brands (Waaree · Tata · Adani · Fronius · Sungrow) — 25-year linear performance warranty transferred to you.
  • SCADA + IoT monitoring for every plant ≥25 kW — remote fault detection, monthly O&M report emailed on the 1st.
  • EPC + O&M + financing under one roof — Ziloxis Loan Desk arranges term-loan / OPEX-PPA if you don't want CAPEX.
High-Intent Q&A

Frequently asked about Solar in Kolkata

What plant size makes sense for a household in Kolkata?+
For a 3 BHK with ~₹4,000-6,000 monthly bill, a 3-5 kW rooftop covers 80-100% of consumption. Post PM-Surya-Ghar subsidy (₹30,000/kW up to ₹78,000) the effective spend is ₹1.6-2.2 lakhs for 3 kW and ₹2.4-3.0 lakhs for 5 kW. Payback: 4.0 – 4.8 years post-subsidy.
Which DISCOM handles my net-metering application in Kolkata?+
CESC (Kolkata core) · WBSEDCL (suburbs). Ziloxis files the application on your behalf, coordinates the site-feasibility inspection and installs the DISCOM-approved bi-directional meter.
Can I claim the PM-Surya-Ghar subsidy in Kolkata?+
Yes. PM-Surya-Ghar ₹30,000/kW (max ₹78,000). WBREDA offers state processing waiver. We manage the portal registration, vendor mapping (Ziloxis is empanelled), inspection and subsidy release. You receive the DBT to your linked bank account within 15-30 days of commissioning.
How long does a solar plant last and what maintenance is needed?+
Modules carry a 25-year linear performance warranty (≥85% output at year 25) from all Tier-1 brands we deploy. Inverters need replacement once (year 10-12). Ziloxis O&M contract includes monthly cleaning + quarterly performance audit + SCADA monitoring.
Do you install solar on rented / leased property in Kolkata?+
Yes — via an OPEX-PPA model. Ziloxis (or our funding partner) owns the plant, you pay only for the units generated at 30-40% below your DISCOM tariff. No CAPEX, no maintenance. Contract runs 10-15 years, transferable at exit.
What is the typical grid-tariff you'd offset in Kolkata?+
₹5.00 – ₹10.20 per kWh (CESC LT-domestic, FY25-26). That's the number that drives your payback — higher your slab, faster the plant pays for itself.
Sectors Ziloxis solarises in Kolkata

Live pipeline — Kolkata

  • Jute / textile rooftops
  • SME cold-chain
  • Housing societies
  • Institutional rooftops
Get our full price grid
All prices exclusive of GST · Taxes extra
MNRE-empanelled EPC
Tier-1 modules · 25-yr linear warranty
PM-Surya-Ghar filed
Subsidy DBT in 15-30 days post-COD
72-hour site-visit SLA
Callback in 20 min · Kolkata team
Ziloxis · From the field in Kolkata

Case studies from live Kolkata solar projects

Manufacturing LT + carport
Jute mill · Titagarh
Plant
260 kW
CAPEX
₹1.1 Cr
Savings
₹34 L / year
Payback
3.2 years
“The West Bengal group-net-metering opened in 2023 — Ziloxis filed our RA application on day one of the notification. CESC approval landed in six weeks.”
Society rooftop + carport
Housing society · New Town (78 flats)
Plant
110 kW
CAPEX
₹52 L
Savings
Common-area bill halved from ₹4.1 L to ₹2 L per month
Payback
3.4 years
“Kolkata's overcast season is the elephant in the room. Ziloxis modelled a 15% haze-loss buffer into the payback — actuals came within 2% of that forecast in year one.”

Case studies are anonymised composites drawn from Ziloxis' actual EPC pipeline in Kolkata. Plant sizes, CAPEX and savings figures reflect real deployed projects.

Free site visit · No obligation

Get a Solar Feasibility Report for Kolkata

Share your monthly electricity bill and rooftop area — we'll send a plant-size, subsidy-adjusted price and payback timeline within 24 hours.

Helps us line up the right loan partner or expedite the direct-purchase paperwork.

Tell us more · quick details

All optional — the more you share, the sharper our first response.

Install Ziloxis
Get 1-tap access. No app store — installs in seconds.